| Interventory for the road construction in the city of Medellin, Phase II |
2007 - 2008 | Area Metropolitana del Valle de Aburra | Interventory for the distributor road construction in the municipality of Medellin, Phase II. | Colombia | Construction Supervision |
Interventory for the distributor road construction Phase II, between the Streets 16 and 34, in the Municipality of Medellin. |
|
| Interventory for the road construction in the city of Medellin |
2007 - 2008 | Area Metropolitana del Valle de Aburra | Interventory for the distributor road construction in the city of Medellin, Phase I. | Colombia | Construction Supervision |
Interventory for the distributor road construction Phase I, between the Zuñiga Creek and 14 Street. Relocation of the transmission line and fiber optics. |
|
| Studies and Design of the Ring Road of Floridablanca - Santander |
2005 - 2008 | INSTITUTO NACIONAL DE VÍAS | Interventory for the studies and designs of the Ring Road of Floridablanca - Santander. | Colombia | Supervision of Studies and Design |
Interventory of the studies and designs, paving and/or resuracing of the roads included in the Paving Program for the Road Infrastructure of integration and development Group 82 Ring Road Floridablanca - Ruitoque with a length of 12 Km., Road Girón - Zapatoca with a length of 13 Km. at the Department of Santander. |
|
| Technical, Administrative and Financial Supervision for the Construction of the Metroplus Corridor |
2005-2007 | Empresa de Desarrollo Urbano - EDU Medellín | Carry out the technical, administrative and financial supervision for the Construction of the trial stretch of the Metroplus Corridor, of the Street 30, between the roads 70 and 55, in the city of Medellin. | Colombia | Supervision of Construction |
Technical, Administrative and Financial Supervision for the Construction of the pilot sector of the Metroplus corridor, of the Street 30, between the Roads, 70 and 55 of the city of Medellin, with a length of 1.5 km. The project included among others, the following activities: Sector analysis, work plan revision, evaluation of the material origins and quarry analysis, evaluation of the constructions conditions, xamining laboratory operation, result analysis and checking their conformance with the general and special specifications of each phase, reports and recommendations of treatment, including their follow-up, supervision of construction of pavement structure (for asphalt and concrete pavement). |
|
| Design, tender assistance, and construction supervision |
2005-2007 | Ministry of Works, Housing and Communications (MoWHC)- Roads Agency Formation Unit (RAFU) | Design, provide pre-contract assistance and supervise the rehabilitation/resealing of the Luwero-Kafu Road (100 km) | Uganda | Definitive Design and Supervision of Construction |
The assignment comprises three phases: 1. Design of the project, 2. Tender Assistance and 3. Construction Supervision of 100 Km of the Luwero - Kafu Road.
The design included data collection, studies and design of the project. Tender assistance including the preparation of the prequalification notices, responding to requests for clarification, managing the site inspection and pre-tender meeting, opening and evaluation of bids, technical evaluation of alternatives, preparation of a tender evaluation report and preparation of the final contract documentation. Construction supervision includes the preparation of final accounts and approval of “as build drawings”. |
|
| Supervision of Improvement Works |
2004 - 2005 | Ministry of Transport | Technical, Administrative, Financial and Environmental supervision of works of improvement | Israel | Supervision of Improvement |
Technical, Administrative, Financial and Environmental supervision of the works of improvement of the highway Kfar Daniel - Gamzo (rural road with granular lining). The services involved revision of quantities of work, authorization of procedures, elaboration of a computerized System of Quality Control producing "on line" reports of materials and equipment, revision of designs, adjustment suggestions in work during the whole course of the project, financial control of expense advance and advance of work execution, environmental supervision, etc. |
|
| Supervision of Improvement of Road |
2001-2003 | Hidropaver Ltda. | Supervision and Monitoring of Improvement of the Nueva Loja - Simón Bolívar road | Ecuador | Supervision of Improvement |
Supervision and Monitoring of the improvement (Construction) and paving of Nueva Loja (Lago Agrio) - Simon Bolivar Road in a length of 65 Km, including construction of bridges. The supervision included cheking works and quality of materials used during the improvement (Extension and construction) of the pavement structure; structural evaluation using the Falling weight Deflectometer to measure the fulfilment of the structural number of design.
|
|
| Rehabilitation Supervision |
2001-2002 | Ministry of Transport | Rehabilitation Supervision of part of the Israel Interurban road network. | Israel | Rehabilitation Supervision |
Supervision of the rehabilitation of sections (aprox. 870 km) of the Israel Interurban Road network, with asphalt mix as part of the integral maintenance plan. The project included sections analysis, work plan review, evaluation of the material sources and quarry analysis, evaluation of the construction conditions and overall quality control (laboratory tests).
|
|
| Supervision of the 63 Street construction |
2000-2002 | Development Urban Institute (Instituto de Desarrollo Urbano-IDU) | Supervision of the construction of 63 Street connection between the 7 and the Circunvalar Avenue | Colombia - Bogotá | Supervision of Construction |
Technical, Administrative, Financial and Enviromental Supervision for the construction of 63rd Street Connection Section Cra. 7 to Avenida Circunvalar.
The project involved supervision of pavement structure construction, fulfilment of technical and environmental specifications, work physical advance, control of used resuources in addition to personal, machinery, equipment, quantity of executed work among others. |
|
| Supervision of Concessioned Road |
2000-2002 | Ministry of Transportation of Israel | Supervision of Sector Iron-Eyal Highway of Concessioned Road | Israel | Supervision/Quality Control |
Supervision and quality control of the Section Iron - Eyal of the Highway Concession Trans - Route Israel. Length 21 km. The activities carried out in this project includes: preliminary control prior to the beginning of the construction, routine control like laboratory and field tests, analysis of results of test, follow-up of the defects alteration, checking of fulfilment of technical design specifications, quality control of construction using a Computarized quality control system (laboratory results, online reports, authorizations, recommendations to the contractor). |
|
| Ring Road Construction Supervision |
1998-1999 | National Institute of Roads | Ring Road Construction Supervision in San Andres island | Colombia, San Andrés | Supervision of Construction |
Technical, administrative, financial, and environmental supervision for the construction and paving of the "circunvalar" (ring road) of San Andres Island, that included the verification of the designs, specification, construction procedures, authorization of the materials. Quality control and approval of the process of the construction , revising the unitary cost solicited by the contractor, the quality control of the materials, control of programs execution project, coordinating and advising with the contractor entity to analyze claims and additional cost. |
|
| Quality Control |
1998-1999 | Ministry of Communications, Transport, Public Works and Housing | Quality Control and supervision of Rehabilitation of Roads in Guatemala | Guatemala | Quality Control and Supervision |
Quality control and supervision of rehabilitation and construction works of the routes: CA 10 San Jacinto - Agua Caliente (47,5 Km) and Rio Hondo - San Jacinto (49,8 Km). The project included quality control using Non destructive testing measuring functional evaluation (level of service) with the laser profilograph RSP L5 and structural evaluation (bearing capacity) with the falling weight deflectometer FWD during the different construction stages. |
|